Guide · Analyse des coûts

Combien coûte vraiment équiper une équipe de construction de 50 personnes ?

La plupart des articles sur le coût d'uniforme donnent juste le prix unitaire. Le vrai chiffre inclut la journée de prise des tailles, les approbations d'échantillon, le budget de recommande et l'attrition de l'an 2. Voici le calcul réel.

10 min read Singhs Print · Updated May 2026 Filed under: Construction, Procurement, Cost analysis
Le contenu détaillé de cet article est disponible en anglais. Une version française intégrale arrive bientôt — contactez-nous au 514-915-1539 pour toute question.

"How much does it cost to outfit my crew?" is the question we get most often from construction operators and ops managers. Most suppliers answer with the unit price and call it done. That number is wrong, because it skips three to four hidden costs that show up six months later when you’re reordering for new hires or replacing the hi-vis your foreman wrecked in week eight.

This guide walks through the actual annual cost of outfitting a 50-person Montreal construction crew with branded workwear — including the parts the unit-price quote misses.

Le scénario

Let’s spec the crew:

Standard outfit per worker:

Coût initial — le calcul au prix unitaire

Pricing reflects Singhs Print’s 50–99 tier rates with embroidered logo. Tier kicks in at total unit count, not per garment type — so 100 t-shirts + 50 hoodies + 50 caps all qualify for the 50–99 tier.

ItemQtyPer unitSubtotal
Hi-vis t-shirts (DTF, 1-side embroidered chest)100$13.95$1,395.00
Hi-vis hoodies (embroidered, 1-side)50$27.95$1,397.50
Embroidered crew caps50$21.95$1,097.50
Embroidery setupincluded$0
Sample-before-productionincluded$0
Initial outfit total200 units$3,890.00

That works out to roughly $77.80 per worker for a fully branded uniform package. That number is the one that ends up in most quotes. It’s correct, but incomplete.

Les quatre coûts cachés que personne ne mentionne

1. Sizing-day labor

To capture sizes correctly you run a fitting day. Half a workday for one supervisor, plus 5–10 minutes per worker for fitting. At Quebec construction supervisor rates (~$45/hr loaded), this is ~$200–$300 of internal labor.

Most operators skip this step and ask workers to self-report sizes. The result: 20% of the first order needs to be reordered in different sizes within month one. That reorder costs more than the sizing-day labor would have.

2. Sample approval round-trips

One supplier sends a sample. The foreman wants embroidery 0.5" larger. You send it back. New sample comes a week later. This round usually costs you 1–2 weeks of timeline, not direct dollars — but if your job-site uniform launch was tied to a project kickoff, you may need to delay the start. Budget the timeline; don’t budget the dollars.

3. Year-1 attrition reorders

Workers lose hi-vis vests. Hoodies get torn on a nail. T-shirts get ruined when someone wipes their hands on them. Expected attrition rate for Montreal construction hi-vis is ~15% of the initial order per year — about 30 units annually. At full tier pricing (no bulk discount because it’s a smaller order), that’s about $500–$700.

4. New-hire reorders

With 15% turnover, you’ll hire 7–8 new workers in year 1. Each needs a 4-piece kit. That’s ~$620 worth of reorders ($77.80 per worker × 8 workers), assuming you can squeeze each new-hire reorder into the 25–49 tier price (slightly higher than 50–99).

For ongoing program reorders we hold your design + spec on file, so new-hire reorders take 5 business days instead of starting from scratch. That’s the operational savings of running this as a program instead of one-off orders.

Le coût complet de l'an 1

Cost lineAnnual
Initial outfit (200 units)$3,890
Sizing-day internal labor$250
Attrition reorders (~15%, ~30 units)$650
New-hire reorders (~7–8 workers)$620
Total year 1$5,410

True year-1 cost: ~$108 per worker, or roughly 40% more than the unit-price quote suggested. That’s the number to put in the budget, not the $77.80.

À partir de l'an 2 — le coût en régime permanent

In year 2 you don’t buy 200 new units. You buy reorders only: attrition (~30 units) + new hires (~30 units) = ~60 units annually.

Cost lineAnnual
Attrition + replacement (~30 units)$650
New-hire reorders (~7–8 workers, ~30 units)$620
Optional refresh / new design every 3rd year$200
Total year 2+~$1,470

The program amortizes nicely after year 1. Steady-state is about $30 per worker per year — comparable to other crew benefits that no one questions.

D'où viennent les économies

The savings on this program are not in the unit price — they’re in the reorder discipline. Specifically:

Formule budgétaire recommandée

For Montreal construction operators of any size, our recommended budget formula is:

For a 50-worker crew at our tier pricing, that’s ~$5,400 in year 1 and ~$1,500 annually after.

Important budget caveat: these numbers assume you stay with the same supplier across reorders. If you re-quote with a new supplier each year, the savings vanish — new setup fees, new sample-approval cycles, mismatched decoration on year-2 units vs. year-1. Pick the supplier carefully (see procurement checklist) and stay with them.

Faites évaluer votre équipe, pas celle d'un autre

Send us your headcount, expected garment mix, and decoration spec. We’ll come back with a quote that lays out year-1 cost and the year-2 reorder math — usually within the hour during business hours.

Évaluer mon équipe →